Bottle Blowing Equipment

KRC5000-I Bottle Blow Molding Machine

Higher-output bottle blowing route for projects that need more capacity than the KRC900 family and production-line planning support.

Bottle format fit

Where this machine route fits.

  • Beverage packaging
  • Daily chemical bottles
  • Oil packaging
  • Factory line expansion
PETPP
2Material options listed
RFQPublic spec fields
4Application routes
KRCMachine family
Engineering route

Engineering notes.

  • Line planning support
  • Mold matching available
  • Installation guidance
  • Contact for capacity configuration
Technical data status

Specification requires engineering confirmation.

Source URL: http://keruicheng.com/en/productsshow_8.html

Contact for specification

The original Keruicheng page exposes the model name and product image but does not publish a full parameter table. Send your bottle drawing, material and output target so engineering can confirm the exact machine configuration.

Ask for specs
Buyer confidence RFQ-gated specs This page separates source-backed public data from information that must be confirmed by engineering.
Quote starts from bottle drawing or sample, not a generic catalog price.
Public specs are shown only where the source data supports them.
Missing parameters are marked for engineering confirmation, not being invented.
RFQ path asks for material, output, mold and destination in one brief.
Bottle samples

Use sample category to confirm mold and machine fit.

Send a bottle sample photo or drawing with this machine model so engineering can check neck finish, volume, material route and mold constraints together.

Daily-use bottle samples sample reference
Daily-use packaging Daily-use bottle samples
Cosmetic bottle shape references sample reference
Cosmetic packaging Cosmetic bottle shape references
Bottle mold output samples sample reference
Sample display Bottle mold output samples
Machine + mold RFQ

Confirm the mold and line route before buying hardware.

For PET and PP bottles, the machine model, mold thickness, cavity plan, preform route and downstream handling should be reviewed together.