What to prepare before asking for a quote.
- Start from material and bottle use case.
- Check heating route and pressure requirements.
- Avoid choosing the mold before machine constraints are known.
A useful RFQ should connect bottle geometry, material, output target, mold route and downstream handling. If those details are missing, the quotation can look fast but fail during engineering review.